+ CRANE FLOOD LIGHTS |
RALEDFLOOD® high power flood lights
|
CONTAINER TERMINALS AND HARBOURS
+ CRANE FLOOD LIGHTS |
RALEDFLOOD® high power flood lights
|
+ MULTI DIRECTION FLOOD LIGHTS |
RALEDFLOOD® multi direction flood lights
|
+ high bay light lines |
with RALEDLINE® high end light lines
|
Container terminal at 24/7 operation are working 50% during the night time. That means high performance light is required in order to perform precise actions with heavy loads. The problem of the current LED flood lights is the height of more than 40 meters above the ground. At this application our reflector technology is able to distribute the light very uniform and with the multi direction heads in every corner. Our new RALEDSOURCE® 120-8 flood light with 8 heads is offering stadium grade light output to industrial applications.
For ship unloading, container handling and truck uploading a perfect uniform illumination of the whole operation area is more than very important. One small mistake due to bad light situation can cost a lot of money or even risk physical harm or death. Therefore illuminations with our multi head flood lights are providing high safety improvement, because every head is flexible in the desired direction, beam angle and power. That results in a perfect uniformity in every corner. In addition the dazzle is very low, due to the high end reflector technology.
In addition to the high bay and flood light application usually large storage facilities need to be illuminated. For this application our RALEDLINE® HD provides many benefits. As a standard high performance solution it can be installed indoor, outdoor and even in rugged environments. Due to the high protection degree of IP65 it can withstand even the hardest installation situation. Also our RALEDLINE® HR version can be used for narrow high storage drive ways. With 30° beam angle it fits to this application perfectly.
every day!
for your pocket!
for our planet!
Complete high efficient terminal and harbour illumination!
Reducing the energy consumption of a complete container terminal or harbour is a very tough task. If we are talking about reduction of 80%+ it sounds impossible. On top of the reduction on maintenance cost by the same rate sounds even more impossible. With our high end product line up for this applications it is not only possible, it should be done immediately. At this application the payback time of less than 2 years, will save after covering the investment millions over 10 years of operation.
[contact-form-7 id=”15514″ html_class=”cf7_custom_style_1″]If you are looking for a professional partner for container terminal applications, please feel free to contact us.